Our Integrated Building System

Anchor 1

SITE PREPARATION

Land of project site must be 95% compacted before laying the foundation of the building.

Anchor 2

EPOD FOUNDATIONS

EBlocks Pods and rebar spacers are laid to create a grid system for the foundation, resulting in cost savings with the same structural strength.

Spacers allow rebars to fall into place without the need of tie

Anchor 3

WALL INSTALLATION

Ergo EBlock Panels are laid out on the substrate, steel bars are inserted and concrete is poured inside the insulated Ergo EBlocks cores to form permanent columns and beams / load bearing walls.

Starter bar and insertion of steel to foundation.

02Wilcon.png

Pouring of concrete into cores.

Anchor 4

UPPER FLOOR INSTALLATION

- Insulated Ergo EBlocks floor panels with embedded stiffeners

- Concrete beams as specified by Structural Engineer

Two Options:

1. EPS

2. Steel Decking

Bond beams are formed inside the panel.

Floor or roof structure is installed on the bond beams.